Real-time dispatching of rubber tired gantry cranes in container terminals

dc.contributor.advisorRoyset, Johannes O.
dc.contributor.authorMcNary, Bradley S.
dc.contributor.corporateNaval Postgraduate School (U.S.)
dc.contributor.secondreaderDell, Robert F.
dc.date.accessioned2012-03-14T17:40:57Z
dc.date.available2012-03-14T17:40:57Z
dc.date.issued2008-03
dc.description.abstractWithin the past 50 years, containerization and globalization have driven a change from small container terminals to large container terminals that need efficient logistic models to keep up with the significant growth in container traffic. Efficiently managing rubber-tired gantry cranes and planning container placement within the terminal are two ways to increase the overall efficiency of a terminal. In this thesis, we combine these strategies in a real-time dispatching tool using an approximate dynamic programming heuristic. The heuristic re-optimizes at the rate the quay crane handles containers, incorporating endogenous and exogenous information in each solution. We formulated and solved an Integer Linear Program (ILP) to estimate the heuristic's solution quality. The heuristic finds solutions within seconds and the absolute gap between the heuristic solution and the ILP solutions remained essentially constant as the size of the problem increased.en_US
dc.description.distributionstatementApproved for public release; distribution is unlimited.
dc.description.serviceUS Navy (USN) author.en_US
dc.description.urihttp://archive.org/details/realtimedispatch109454179
dc.format.extentxiv, 41 p. : ill.(some col.) ;en_US
dc.identifier.oclc227366811
dc.identifier.urihttps://hdl.handle.net/10945/4179
dc.publisherMonterey California. Naval Postgraduate Schoolen_US
dc.subject.lcshContainer terminalsen_US
dc.subject.lcshUnited Statesen_US
dc.subject.lcshManagementen_US
dc.subject.lcshBusiness logisticsen_US
dc.subject.lcshGantry cranesen_US
dc.subject.lcshUnitized cargo systemsen_US
dc.subject.lcshCost effectivenessen_US
dc.subject.lcshMarine terminalsen_US
dc.subject.lcshEconometric modelsen_US
dc.titleReal-time dispatching of rubber tired gantry cranes in container terminalsen_US
dc.typeThesisen_US
dspace.entity.typePublication
etd.thesisdegree.disciplineOperations Researchen_US
etd.thesisdegree.grantorNaval Postgraduate Schoolen_US
etd.thesisdegree.levelMastersen_US
etd.thesisdegree.nameM.S.en_US
etd.verifiednoen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
08Mar_McNary.pdf
Size:
672.23 KB
Format:
Adobe Portable Document Format
Collections