The Remanufacturing Process of Defense Assets With Stochastic Yield
Loading...
Authors
Ferrer, Geraldo
Subjects
remanufacturing
process yield
material recovery
stochastic optimization
simulation
process yield
material recovery
stochastic optimization
simulation
Advisors
Date of Issue
2010
Date
Publisher
Language
Abstract
This study provides the analysis of the material planning strategies for six remanufacturing settings that are common to defense assets and to other technical equipment. These settings are classified according to two dimensions: the supplier’s lead time to deliver replacement components (compared to the duration of the process), and the stage in the process that the recovery yield is identified (before disassembly, after disassembly or during component repair). The production plans for the three settings with short supplier’s lead time are solved optimally. The long supplier’s lead time of the three other settings complicate the analysis, so the paper offers production plans that approximate the optimal policy in these cases.
Type
Technical Report
Description
Series/Report No
Department
Identifiers
NPS Report Number
NPS-GSBPP-10-011
Sponsors
Funder
Format
55 p.
Citation
Distribution Statement
Approved for public release, distribution is unlimited.
