Expected performance of the Global Broadcast Service (GBS), Phase II, with emphasis on environmental limitations to supportable data rates

Authors
Scotty, Stephen D.
Advisors
Moose, Paul H.
Ha, Tri T.
Second Readers
Subjects
NA
Date of Issue
1997-06
Date
Publisher
Monterey, CA; Naval Postgraduate School
Language
Abstract
The US military requires a high capacity, high availability broadcast capability to provide timely dissemination of standard products to users who cannot rely on terrestrial links. The Global Broadcast Service (GBS) is being developed to meet this requirement. The key limiting factor in GBS availability is environmental losses, specifically atmospheric absorption and rainfall loss. The optimum frequency band for GBS would have been between 1-10 GHz. At this frequency range, environmental losses are negligible. However, congestion in this frequency range has forced DoD to choose a much higher frequency band for GBS, 20/30 GHz (K/Ka band). At this frequency band environmental losses, specifically rain loss, will be a key limiting factor to GBS availability. This thesis analyzes GBS Phase 2 performance taking into account atmospheric limitations. A key problem in determining the performance of GBS lies in the accuracy of existing rain loss models. Several rain loss prediction models were considered, and based on studies conducted by the ITU-R and Stanford Telecom, the USA rain model was chosen for this analysis. This thesis has shown that, due to environmental losses, high availability can best be achieved if GBS is capable of lowering its data rate during periods of precipitation.
Type
Thesis
Description
Series/Report No
Department
Organization
Identifiers
NPS Report Number
Sponsors
Funding
Format
101 p.
Citation
Distribution Statement
Approved for public release; distribution is unlimited.
Rights
Collections