A comparison of alternative methods of obtaining Defense Logistics Agency (DLA) cognizance spare parts for Contractor Furnished Equipment (CFE) during initial outfitting of U.S. Navy ships

Loading...
Thumbnail Image
Authors
Pinkerton, Kim Gregory
Subjects
Supply support
Outfitting
Provisioning
Outfitting models
Government Furnished Materials
Contractor Furnished Materials
Defense Logistic Agency Material
Advisors
Gates, William R.
Date of Issue
1991-12
Date
December 1991
Publisher
Monterey, California. Naval Postgraduate School
Language
en_US
Abstract
This thesis is a limited determination of the most cost effective method of acquiring Defense Logistics Agency (DLA) cognizance initial outfitting material for new construction ships. The study is restricted to Contractor Furnished Material (CFM) required to support Contractor Furnished Equipment (CFE) contained in the Hull, Mechanical, Electrical, Ordnance and Electronics (HMEO&E) Coordinated Shipboard Allowance List (COSAL). Three alternative methods of procuring the material are analyzed for cost effectiveness: (1) the shipbuilder procures the material commercially, (2) the shipbuilder is allowed access to the Federal Supply System (FSS) and requisitions the material, (3) the Naval Supervising Agency (NSA) requisitions the material from the FSS in which case it becomes Government Furnished Material (GFM). Material availability using each of the alternatives is also examined.
Type
Thesis
Description
Series/Report No
Department
Department of Administrative Sciences
Organization
Naval Postgraduate School (U.S.)
Identifiers
NPS Report Number
Sponsors
Funding
Format
86 p.
Citation
Distribution Statement
Approved for public release; distribution is unlimited.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Collections