CGN 41 : a case study of ship procurement

dc.contributor.advisorDean, S. Michael
dc.contributor.authorKlinkhamer, David Joseph
dc.contributor.authorPence, Derry T.
dc.contributor.corporateNaval Postgraduate School (U.S.)
dc.contributor.departmentAdministrative Sciences
dc.contributor.secondreaderButtinger, James D.
dc.dateMarch 1978
dc.date.accessioned2012-11-16T19:21:11Z
dc.date.available2012-11-16T19:21:11Z
dc.date.issued1978-03
dc.description.abstractThis thesis presents, in a case study format, the conflict between Newport News Shipbuilding and Drydock Company and the Navy over the execution of the option to build the CGN-Ul. In the case, the reader is taken from the time of the signing of the original contract in 1971 through the events leading to the negotiated settlement reached by Mr. Gordon Rule. Emphasis is placed on Newport News' contention that this option was invalid, the events leading to a work stoppage by Newport News and a Federal District Court's order for both parties to negotiate in good faith, and finally the events leading to Mr. Rule's appointment and the validity of the agreement by him with Newport News. Additional information is provided as Technical Notes to the case, which include: Shipbuilding in the U. S., Newport News, Ship Procurement and Claims Procedures. A Teaching Note is provided to assist in application of the case to a Ship Acquisition Management course.
dc.description.distributionstatementApproved for public release; distribution is unlimited.
dc.description.serviceLieutenant Commander, United States Navy
dc.description.serviceLieutenant, United States Navy
dc.description.urihttp://archive.org/details/cgncasestudyofsh1094518367
dc.identifier.urihttps://hdl.handle.net/10945/18367
dc.language.isoen_US
dc.publisherMonterey, California. Naval Postgraduate Schoolen_US
dc.rightsThis publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
dc.subject.lcshManagementen_US
dc.titleCGN 41 : a case study of ship procurementen_US
dc.typeThesisen_US
dspace.entity.typePublication
etd.thesisdegree.disciplineManagementen_US
etd.thesisdegree.grantorNaval Postgraduate Schoolen_US
etd.thesisdegree.levelMastersen_US
etd.thesisdegree.nameM.S. in Managementen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
cgn41casestudyof00klin.pdf
Size:
7.68 MB
Format:
Adobe Portable Document Format
Collections