Logistics and maintenance options to support the P-8A Poseidon's expeditionary mission

Download
Author
Calamug, Bernard F.
Trout, James A.
Date
2010-06Advisor
Yoho, Keenan
Nalwasky, Richard
Metadata
Show full item recordAbstract
The purpose of this research is to identify the maintenance and logistics support structure needed to support the P-8A's Anti-submarine Warfare (ASW), Anti-surface Warfare (ASUW), and Intelligence, Surveillance, and Reconnaissance (ISR) missions, while operating away from Permanent Deployment Sites (PDS) in austere operating areas, and to provide a set of possible support recommendations for these missions. This study will focus on the existing maintenance and logistics support structures currently being utilized for missions being performed by the P-3 Orion, and to propose organizational and operational recommendations to better support the agile, flexible, and responsive missions requirement of the P-8A. The result will provide feasible alternatives for decision makers regarding organizational design as well as logistics and maintenance requirements to support overseas deployments to remote, forward operating locations (FOL).
Description
MBA Professional Report
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.Related items
Showing items related by title, author, creator and subject.
-
Case study: mission capacity and life cycle cost analyses for new fighter aircraft, F-XX
Doerr, Kenneth H.; Kang, Keebom (Monterey, California, Naval Postgraduate School, 2014); NPS-LM-12-212This case is intended to illustrate key trade-offs in planning the acquisition of a major weapon system. In particular, the impact of logistics and maintenance decisions on life-cycle costs and readiness are examined. The ... -
Logistics and Maintenance Options to Support the P-8A Poseidon's Expeditionary Mission
Calamug, Bernard; Trout, James (Monterey, California. Naval Postgraduate School, 2010-07-01); NPS-LM-10-016The purpose of this research is to identify the maintenance and logistics support structure needed to support the P-8A''s Anti-submarine Warfare (ASW), Anti-surface Warfare (ASUW), and Intelligence, Surveillance, and ... -
Optimal maintenance policies applicable to repairable systems onboard ships
Singh, Sukhdev (Monterey, California. Naval Postgraduate School, 1991-03);Maintenance, a key element of Integrated Logistics Support, plays a very vital role throughout an equipment/system planned life-cycle. Maintenance costs contribute a major portion of the life cycle costs of an equipment ...