Fully burdened cost of fuel using input-output analysis

Download
Author
Hills, John W.
Date
2011-12Advisor
Regnier, Eva
Second Reader
Nussbaum, Daniel A.
Metadata
Show full item recordAbstract
The Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 mandates that the Fully Burdened Cost of Fuel, including the total cost of procuring and transporting fuel, infrastructure operating costs, and the cost of force protection for the logistics tail, be applied in trade-off analyses for all Defense systems that create a demand for energy. Using data from the Defense Logistics Agency Energy, this thesis builds a model of its worldwide supply chain for bulk fuels, and uses the principles of input-output analysis to calculate the total cost to deliver three fuel types to each destination in the supply chain. Although the Defense Logistics Agency Energy charges a standard price to each service for bulk fuels, these results show that they incur very different costs, ranging from less than a penny per gallon to over 70 cents per gallon, to deliver to different locations. Given the appropriate data on services' fuel distribution networks, a Defense-wide extension of the Bulk Fuels Distribution Model could be used to replace the current seven-step Fully Burdened Cost of Fuel process with a single step, allowing for less complex and more accurate Fully Burdened Cost of Fuel calculations.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.Collections
Related items
Showing items related by title, author, creator and subject.
-
Potential cost savings and cost avoidances associated with security cooperation training programs
Carroll, Michael J. (Monterey, California: Naval Postgraduate School, 2015-12);In this project, I examine the current security cooperation and assistance efforts in the U.S. Africa Command area of responsibility with a particular focus on training of foreign military forces under 10 U.S. Code § 2282. ... -
Cost as an Independent Variable (CAIV): Front-End Approaches to Achieve Reduction in Total Ownership Cost
Boudreau, Michael (2005-05-01); NPS-FM-05-052During the latter half of the 1980s and throughout much of the 1990s, budget constraints were increasingly tight, resulting in Defense budget reductions (measured in constant dollars); these reductions commenced in FY 1986 ... -
A model of defense for Russia.
Hanson, David B. (Monterey, California: Naval Postgraduate School, 1993-06);This thesis constructs an original model of defense for Russia. This model is developed in the context of Russia's current military situation, but can easily be adapted to other nations. It explains the geographic extent ...