Case study : FFG-7 class ship.

Download
Author
Easton, Frederick Bigelow
Date
1978Advisor
Buttinger, J.D.
Second Reader
Owens, J.W.
Metadata
Show full item recordAbstract
Estimating the cost of a major weapons system is an
extremely complex process involving interrelationships
between a number of organizations. This thesis is an
examination of the events surrounding the cost estimating
effort involved for the FFG class ship using a case study
approach. The case discusses concepts involved in the FFG
procurement which include the high-low mix, design to cost,
life cycle costing, lead ship/follow-on ship procurement,
fly before buy, independent cost estimating, and learning
curve theory. A teaching note is provided to stimulate
classroom discussion and analysis of the major areas covered
in the case. Questions which may be used in classroom
discussion or for assignment and the essentials of learning
curve theory are also provided.