Show simple item record

dc.contributor.authorBergan, Shawn J.
dc.date.accessioned2013-01-23T21:54:44Z
dc.date.available2013-01-23T21:54:44Z
dc.date.issued1994
dc.identifier.urihttp://hdl.handle.net/10945/25891
dc.description.abstractWhen a delay causes contractors to be shut down or turn idle for a period of time, fixed overhead as well as general and administrative expenses continue to be incurred. However, the amount of direct costs to which these expenses can be allocated or expensed is reduced. The result is an amount of overhead that is unabsorbed, which can be allocated to that specific delay. Various pricing methods for calculating these unabsorbed home office overhead expenses currently exist in the construction litigation process today. The per diem Eichleay method is the most frequently utilized method. In this era of financial austerity, the armed forces are facing challenges to maintain operational readiness with fewer personnel and leaner operating capital due to shrinking defense budgets. One way to optimize these precious and limited resources is the efficient and effective use of construction funds and personnel in Naval Facilities Engineering Command (NAVFACENGCOM) construction administration. This report focuses on the commonly utilized Eichleay method of computation, as well as alternative methods currently utilized in today's construction industry. Research and analysis was conducted on current litigated construction claims resulting from disputes involving the Eichleay formula. Assumptions about the Eichleay formula method and its shortcomings have been provided. Emphasis on utilizing other methods of calculating these damages to the contractor as well as situation specific modifications of the Eichleay formula itself are also included. Conclusions were drawn from the data that identify significant strengths and weaknesses among these common place case situations. Recommendations were made for future possible improvements regarding the recognition and avoidance of potential claims by contractors. The target audience of this report is the junior construction project manager (Naval Civil Engineer Corps officer/civilian government personnel) and is to be utilized as a guide in the NAVFACENGCOM construction organization atmosphere for calculating legitimate contractor's unabsorbed home office overhead expense for a government caused suspension, delay, or disruption to the contract performance.en_US
dc.description.urihttp://archive.org/details/eichleayformulai00berg
dc.format.extent1 v. (various foliations)en_US
dc.language.isoen_US
dc.publisherMonterey, California. Naval Postgraduate Schoolen_US
dc.rightsThis publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, may not be copyrighted.en_US
dc.titleThe Eichleay formula in Naval Facilities Engineering Command (NAVFACENGCOM) contracting.en_US
dc.typeThesisen_US
dc.contributor.departmentCivil Engineering
dc.identifier.oclcocn640605659
etd.thesisdegree.nameMaster of Civil Engineeringen_US
etd.thesisdegree.levelMastersen_US
etd.thesisdegree.disciplineCivil Engineeringen_US
etd.thesisdegree.grantorTexas A&Men_US