The purpose of this thesis is to determine if plant equipment packages are a viable resource for industrial surge and mobilization. A plant equipment package is a Department of Defense term used to describe an approved complement of different pieces of controlled industrial plant equipment including special tools, special test equipment, and other plant equipment. These items are put together at a predetermined facility to form a production line to manufacture critical war material. Differences between Army and Navy plant equipment management were identified, and condition assessments of industrial plant equipment were examined through the study of Acme-Gridley lathes in Army plant equipment packages.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.Collections
Related items
Showing items related by title, author, creator and subject.
-
Developing a handbook for construction equipment management and implementation
Seignious, Russell V. (Monterey California. Naval Postgraduate School, 1999);Construction equipment may constitute one of the single largest long term capital investments for a contractor. This is particularly true for those contractors engaged primarily in horizontal construction. Regardless of ... -
An analysis of USMC heavy construction equipment (HCE) requirements
Blaxton, Allen C.; Fay, Michael J.; Hansen, Cheryl M.; Zuchristian, Christopher M. (Monterey, California. Naval Postgraduate School, 2003-06);According to I and L, HQMC, the Marine Corps needs to re-evaluate current operational requirements for engineer construction equipment. Acquisition and force allocation levels for equipment have remained essentially at ... -
Applying industrial design best practices in the acquisition of soldier equipment
Perryman, Theodore M. (Monterey, California. Naval Postgraduate School, 2002-03);Too often a piece of equipment is delivered which, though functional, is unusable. The computer provides us an excellent example of this phenomenon in our daily life. The goal of any designer should be to develop a piece ...