Development Phase Cost Drivers for Production Costs: The Case of Tracked Vehicles
Abstract
There are two different approaches, the disjoint and sequential models, which attempt to account for differences between development unit cost and production unit cost. The disjoint model uses a production cost improvement curve that is physically separate from the development cost improvement curve. For the sequential model, however, the first unit cost of production units directly follows the last development unit due to a carryover of the cost improvement process. This paper, using a sample of seven tactical armored tracked vehicles, first obtains the theoretical first unit production costs for the vehicles under both sequential and disjoint models. Then, using various measures of activities in the development phase, CERs are obtained for both models which relate activities in the development phase to theoretical first unit production cost. The results indicate that, for the disjoint model, first unit production costs depend on development first unit costs. For the sequential model, first unit production costs depend on the average development cost as well as the time span between the end of development and the beginning of production.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.NPS Report Number
NPS-AS-93-012Related items
Showing items related by title, author, creator and subject.
-
Parametric cost estimation utilizing development-to-production cost relationship applied to the advanced amphibious assault vehicle
Malcolm, David S. (Monterey, California. Naval Postgraduate School, 1991-12);This thesis examines the relationship between development unit cost and production unit cost. Historical data from seven armored tracked vehicle programs is used to test the relationship. A study of this relationship is ... -
Design and analysis of an object-oriented database of electronic warfare data
Coyne, Kevin M. (Monterey, California. Naval Postgraduate School, 1996-03);The Electronic Warfare Integrated Reprogramming Database (EWIRDB) is the primary Department of Defense (DoD) approved source of electronic warfare (EW) data. Its utilization in the areas of battle planning and EW research ... -
Production and Sales Planning with Limited Shared Tooling at the Key Operation
Brown, Gerald G.; Geoffrion, Arthur M.; Bradley, Gordon H. (1981);The focus of this paper is multiperiod production and sales planning when there is a single dominant production operation for which tooling (dies, molds, etc.) can be shared among parts and is limited in availability. Our ...