Operational procedures for powering up, powering down, and configuring the qualification model of the FLTSATCOM satellite

Loading...
Thumbnail Image
Authors
Lawson, H.
Subjects
Fleet Satellite Communications
Qualification Model
Automatic Procedures
Power-up/Power-down procedures
Initialization and Control
Operational Procedures
Advisors
Boger, Dan C.
Date of Issue
1990-09
Date
1990-09
Publisher
Monterey, California: Naval Postgraduate School
Language
Abstract
The engineering qualification model of the FLTSATCOM satellite was donated and is to be used for instructional laboratories and research. With the acquisition of this spacecraft, a course was established on spacecraft testing with the intent of using the qualification model as a lab device. The course requirement calls for the ability to power up, power down, and configure the satellite within a reasonable time frame. The objective of this thesis is to produce a single source implementation guide which will fully document the step- by-step procedures for powering up, powering down, and configuring the qualification model of the FLTSATCOM satellite in its current modified configuration.
Type
Thesis
Description
Series/Report No
Department
Space Systems Academic Group
Organization
Naval Postgraduate School (U.S.)
Identifiers
NPS Report Number
Sponsors
Funder
Format
viii, 155 p. ill.
Citation
Distribution Statement
Approved for public release; distribution is unlimited.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Collections