Eastern North Carolina Marine Corps Forces and installations high intensity Hurricane evacuation decision support

Download
Author
Taylor, Brian J.
Date
2007-06Advisor
Jacobs, Patricia
Regnier, Eva
Second Reader
Posadas, Sergio
Metadata
Show full item recordAbstract
Eastern North Carolina Marine Corps Forces and Installations (ENCMCFI) is located on the Atlantic coast of North Carolina and is therefore vulnerable to a major hurricane. Base commanders must weigh the substantial costs of evacuation - approximately 3 0- 5 0M for a full evacuation - against the risk posed by the effects of the storm if personnel are not evacuated. The purpose of this thesis is to provide a decision aid for base commanders to identify forecast conditions that indicate the need to initiate an evacuation. In order to assess the probability of a direct strike to ENCMCFI posed by a new storm, this thesis proposes using National Hurricane Center forecasts combined with a statistical model of historical forecast errors. Additionally an analysis of evacuation assets available and the distances to primary evacuation locations is also conducted to identify available options for evacuation at the decision time. A series of decision rules is created to determine whether, based on the current storm forecast and the available evacuation assets, evacuation is warranted now or whether it is better to wait until the next forecast is issued. The results of this study indicate that the risk of riding out the storm at ENCMCFI and the transportation risk of evacuating are approximately equal given the current evacuation plan and the required decision lead time.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.Collections
Related items
Showing items related by title, author, creator and subject.
-
Information forecasting for hurricane preparation
Regnier, Eva D.; Harr, Patrick (AMS, 2006);At the lead times required to complete a sortie, evacuation, or other preparation, the future track of a tropical cyclone is uncertain. The decision whether and when to prepare is based on a forecast and information about ... -
What Is Six Hours Worth? The Impact of Lead Time on Tropical-Storm Preparation Decisions
Regnier, Eva D. (Informs, 2020);Emergency managers must make high-stakes decisions regarding preparation for tropical storms when there is still considerable uncertainty regarding the storm’s impacts. Forecast quality improves as lead time until the ... -
The Hurricane Decision Simulator: A Tool for Marine Forces in New Orleans to Practice Operations Management in Advance of a Hurricane
Regnier, Eva D.; MacKenzie, Cameron A. (INFORMS, 2018);The U.S. Marine Forces Reserve (MFR) in New Orleans is frequently threatened by hurricanes. To protect the safety of personnel and their families while maintaining mission capability, the Commander must make timely decisions ...