Survey of productivity rates used for highway construction.
Abstract
The purpose of this paper was to report on a survey conducted by the University of Florida for the Florida Department of Transportation (FDOT). The survey analyzed the productivity rates used by the FDOT to determine contract duration with respect to highway construction contracts. The survey also reported on some of the factors that affect productivity. A questionnaire was sent to each FDOT Resident Engineer to survey the current productivity rates that are being achieved by contractors. The contractor productivity rates where then compared to the current productivity rates used by the FDOT, and recommended changes are offered. Also included in this paper are discussions concerning the importance of productivity in the construction industry, and the importance of using productivity to estimate contract duration and construction costs.
Description
This thesis document was issued under the authority of another institution, not NPS. At the time it was written, a copy was added to the NPS Library collection for reasons not now known. It has been included in the digital archive for its historical value to NPS. Not believed to be a CIVINS (Civilian Institutions) title.
Rights
Copyright is reserved by the copyright owner.Collections
Related items
Showing items related by title, author, creator and subject.
-
EXPLORING PRODUCTIVITY AND WORKPLACE SATISFACTION OUTCOMES FOR EMPLOYEES PARTICIPATING IN TELEWORK AT THE AIR FORCE ACQUISITION MANAGEMENT AND INTEGRATION CENTER (AMIC)
Ramirez, Shelby A. (Monterey, CA; Naval Postgraduate School, 2022-06);This mixed methods study analyzes data before and during the COVID-19 pandemic with two purposes: first, to explore how changes to the amount of telework permitted at AMIC impact employee perceptions of productivity and ... -
Satisfaction with arbitration: a survey of participants
Schenk, Robert Eugene (Monterey California. Naval Postgraduate School, 1988);The objective of this paper is to attempt to determine whether participants in the arbitration process are satisfied with arbitration, as it is practiced today, as a means for resolving their disputes. A questionnaire was ... -
A study of the Naval Construction Force project material supply chain
Stasick, Steven J. (Monterey California. Naval Postgraduate School, 2004-06);The Naval Construction Force (NCF) performs construction projects in all areas of the world during both peacetime and war. While some of these projects occur in populated areas where project materials are readily available, ...