Understanding the current 30-year shipbuilding plan through three models

Download
Author
Blind, Patrick E.
Date
2014-12Advisor
Candreva, Philip
Second Reader
Hocevar, Susan
Metadata
Show full item recordAbstract
The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and why the Navy settled on the numbers contained in the proposal. Viewing the plan as a decision reached by a government entity allows a thorough investigation of the matter utilizing Graham Allison’s approach from his work, Essence of Decision. Through the lenses of rational actor model, organizational behavior model, and government politics model, the Annual Long-Range Plan for Construction of Naval Vessels for FY2015 will be analyzed to better understand the requirements, organizational routines, major players, and special interests that ultimately result in a plan submitted to congress. Through this analysis, a better understanding of the processes, procedures and inner workings of the Navy will become apparent and show the FY2015 Long Range Plan is rather complex and beholden to many stakeholders, each wishing to exert influence over the outcome.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.Related items
Showing items related by title, author, creator and subject.
-
A study of the Naval Construction Force project material supply chain
Stasick, Steven J. (Monterey California. Naval Postgraduate School, 2004-06);The Naval Construction Force (NCF) performs construction projects in all areas of the world during both peacetime and war. While some of these projects occur in populated areas where project materials are readily available, ... -
"Terrorism and its impact on the construction industry"
Kosnick, Scott. (Monterey, California. Naval Postgraduate School, 2005-05);This paper focuses on the impact that the 9/11 terrorist attacks have had on the U.S. construction industry. The paper breaks the construction project life cycle down into three phases -- Initiation, Design, and ... -
Adaptation of prestressed concrete to modular girder bridge design for advanced base construction
Snow, Arthur W.; Meeks, Arthur F. (Rensselaer Polytechnic Institute, 1953-05-20);The design of a series of precast prestressed concrete bridges for Naval advanced base construction is presented in this thesis. Girder type concrete bridges composed of modular prestressed girders of I).0, 60, 80, 100 and ...