Developing Standard EMD Cost Factors For Major Defense Acquisition Program (MDAP) Platforms

Download
Author
Markman, Capt Matthew R.
Ritschel, Jonathan D.
White, Edward D.
Valentine, Shawn
Date
2019-04-30Metadata
Show full item recordAbstract
This paper creates standard cost factors that more accurately reflect observed outcomes in the development stages of major programs. Specifically, this effort creates 443 new cost factors that are delineated by five categories: commodity type, contract type, contractor type, development type, and service. The factors are developed for those elements that are “common” in a wide array of projects such as program management, systems engineering, data, or training. This paper establishes factor values at the Work Breakdown Structure (WBS) element level for each subcategory of the five identified categories. Coefficient of Variation (CV) values were found to be high (71.86% to 179.87%) in each subcategory. In a refined subset of the dataset, the CV decreased, indicating that the average percent estimating error improved when more detailed information was available. The outcome of this research is that cost estimators will have a reference tool of 443 unique factors for creating estimates and conducting the iterative process of refining cost estimates.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.NPS Report Number
SYM-AM-19-082Collections
Related items
Showing items related by title, author, creator and subject.
-
Case study: mission capacity and life cycle cost analyses for new fighter aircraft, F-XX
Doerr, Kenneth H.; Kang, Keebom (Monterey, California, Naval Postgraduate School, 2014); NPS-LM-12-212This case is intended to illustrate key trade-offs in planning the acquisition of a major weapon system. In particular, the impact of logistics and maintenance decisions on life-cycle costs and readiness are examined. The ... -
A study of the flow of bulk material in bins
Reese, John Warren (Purdue University, 1954);The major problem in handling bulk material in bins is flow stoppage, which is the hanging-up of material within the bin. Although^ there are generalizations as to why materials cease to flow, arch, or funnel, clear ... -
Improving Acquisitions In Science And Technology Programs: Creating Unique Cost Factors To Improve Resource Allocation Decisions
Ritschel, Jonathan D.; Plack, Eric A.; Edwards, Jordan S.; White, Edward D.; Koschnick, Clay M.; Drylie, Scott T. (Monterey, California. Naval Postgraduate School, 2021-08); AFIT-CE-21-230.pdfCost factors are a common technique employed in Major Defense Acquisition Program (MDAP) cost estimating. The extant suite of available factors, however, primarily consists of development factors from the Engineering and ...