Naval Postgraduate School
Dudley Knox Library
NPS Dudley Knox Library
View Item 
  •   Calhoun Home
  • Theses and Dissertations
  • 1. Thesis and Dissertation Collection, all items
  • View Item
  •   Calhoun Home
  • Theses and Dissertations
  • 1. Thesis and Dissertation Collection, all items
  • View Item
  • How to search in Calhoun
  • My Accounts
  • Ask a Librarian
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All of CalhounCollectionsThis Collection

My Account

LoginRegister

Statistics

Most Popular ItemsStatistics by CountryMost Popular Authors

A Study to Determine Impacts on Cost and Readiness Of Variations in the Development and Release Cycle of the F/A-18 EF and EA-18G Software Configuration Set (SCS)

Thumbnail
Download
Icon2009_03_EMBA_Carr.pdf (1.277Mb)
Download Record
Download to EndNote/RefMan (RIS)
Download to BibTex
Author
Carr, Timothy
Chebi, Carl
Cook, Gerald
Coons, Russell
Prevost, Mike
Date
2009-03-01
Advisor
Wood, Frank
Metadata
Show full item record
Abstract
EXECUTIVE SUMMARY: This project was completed by Patuxent River EMBA Cohort Consulting Team, on behalf of PMA-265, and facilitated through the Naval Postgraduate School Executive MBA program. The three main objectives of the project were: (1) Determine impacts on cost and readiness of variations in the development and release cycle of the F/A-18 E/F and EA-18G System Configuration Set (SCS); (2) Provide the F/A-18 Program Office with a clearer picture of the current trends associated with varying the SCS release cycle; (3) Provide the program office with a means to evaluate cost and readiness impacts of the SCS release cycle. This project focused on four main areas of interest: (1) Identification of fixed and variable costs incurred in the development and fielding of the F/A-18 SCS for use in the identification of cost impacts due to variation in SCS release interval; (2) Programmatic and schedule impacts on external stakeholders due to variations in SCS release interval (3) F/A-18 Fleet training and readiness impacts due to variation in SCS release interval; (4) Determining SCS release plan that balances capability, schedule, costs and impacts to the war fighter to ensure delivery of the right readiness, at the right time, at the right cost. Based on the analysis of the SCS release interval, we determined that a one year interval was too short, 4 years was too long, and the optimal interval is somewhere between 2 and 3 years. Utilizing historical SCS cost and developmental timelines provided by the Advanced Weapons Lab, we determined that 88% of the cost associated with releasing an SCS were variable, and only 12% were fixed. Modeling this data and running cost models excursions at varying SCS release intervals, we determined that the greatest cost was associated with a 1 year SCS release interval and that costs decreased as the SCS release interval increased. Implementing a 4 year SCS release cycle results in savings of up to $63.5 million as compared to one year SCS release costs. Examining typical Aircrew, Squadron and Air Wing training plans, we determined that a 1 year SCS release interval resulted in decreased Aircrew Flight proficiency and increased training requirements. As the SCS release interval increased to 4 years, Aircrew, Squadron and Air Wing proficiency increased and training plans were optimized. SCS release intervals for a major SCS (delivers capability and implements software fixes) and minor SCS (implements software fixes only) were also examined to determine optimal combination that resulted in delivery of both new capability as well as fixes to software. A combination of a major SCS combined with a minor SCS release will result in software anomalies being fixed quicker while delivering equivalent capability to the fleet over the 8 year life of the F/A-18 Flight Plan. While most of the criteria we analyzed indicated longer SCS release intervals were optimal, there were some criteria that indicated short SCS release intervals were optimal. Analyzing current program capability roadmaps, from all stakeholders who implement capability on to the F/A-18 E/F, we determined that a 1 or 2 year SCS release interval best aligned with current program office capability road maps. As the SCS release interval increased to 4 years, program office capability road maps were misaligned with SCS releases, resulting in significant program cost and schedule impacts. Longer SCS release intervals will negatively impact the delivery of required capability to the fleet. The F/A-18 E/F is the lead platform for many new capabilities being released to the fleet. All capabilities implemented on the F/A-18 are tightly integrated with the SCS, and if F/A-18E/F SCS release interval is extended, the introduction of those capabilities will also be extended. Combining all the results from the different focus areas, we determined that a 36 month major / 18 month minor SCS release interval best balances capability, schedule, costs and external stakeholder impacts. However, due to limitations of the DOD acquisition process timeline, many program offices have developed acquisition plans based on existing SCS release timelines, and shifting them now could significantly impact those programs. As such, we performed additional analysis with SCS release interval impacts to current program capability roadmaps more heavily weighted, which indicated that a 24 month major / 12 month minor SCS release interval provided the best balance for all parameters (cost, schedule, performance and other program office roadmaps).
Description
EMBA Project Report
URI
https://hdl.handle.net/10945/7055
Collections
  • 1. Thesis and Dissertation Collection, all items
  • 4. Executive Master of Business Administration (EMBA) Project Final Reports

Related items

Showing items related by title, author, creator and subject.

  • Thumbnail

    Automated Data for DevSecOps Programs 

    Nichols, William Richard; Yasar, Hasan; Antunes, Luiz; Miller, Christopher L.; McCarthy, Robert (Monterey, California. Naval Postgraduate School, 2022-05-02); SYM-AM-22-071
    Automation in DevSecOps (DSO) transforms the practice of building, deploying, and managing software intensive programs. Although this automation supports continuous delivery and rapid builds, the persistent manual collection ...
  • Thumbnail

    Automated Data for DevSecOps Programs 

    Nichols, William Richard; Yasar, Hasan; Antunes, Luiz; Miller, Christopher L.; McCarthy, Robert (Monterey, California. Naval Postgraduate School, 2022-05-02); SYM-AM-22-071
    Automation in DevSecOps (DSO) transforms the practice of building, deploying, and managing software intensive programs. Although this automation supports continuous delivery and rapid builds, the persistent manual collection ...
  • Thumbnail

    When is it Feasible (or Desirable) to use the Software Acquisition Pathway? 

    Tate, David M.; Bailey, John (2022-05-02); SYM-AM-22-056
    DoD Instruction 5000.87 establishes a Software Acquisition Pathway (SWP) “for the efficient and effective acquisition, development, integration, and timely delivery of secure software” (Office of the Under Secretary of ...
NPS Dudley Knox LibraryDUDLEY KNOX LIBRARY
Feedback

411 Dyer Rd. Bldg. 339
Monterey, CA 93943
circdesk@nps.edu
(831) 656-2947
DSN 756-2947

    Federal Depository Library      


Start Your Research

Research Guides
Academic Writing
Ask a Librarian
Copyright at NPS
Graduate Writing Center
How to Cite
Library Liaisons
Research Tools
Thesis Processing Office

Find & Download

Databases List
Articles, Books & More
NPS Theses
NPS Faculty Publications: Calhoun
Journal Titles
Course Reserves

Use the Library

My Accounts
Request Article or Book
Borrow, Renew, Return
Tech Help
Remote Access
Workshops & Tours

For Faculty & Researchers
For International Students
For Alumni

Print, Copy, Scan, Fax
Rooms & Study Spaces
Floor Map
Computers & Software
Adapters, Lockers & More

Collections

NPS Archive: Calhoun
Restricted Resources
Special Collections & Archives
Federal Depository
Homeland Security Digital Library

About

Hours
Library Staff
About Us
Special Exhibits
Policies
Our Affiliates
Visit Us

NPS-Licensed Resources—Terms & Conditions
Copyright Notice

Naval Postgraduate School

Naval Postgraduate School
1 University Circle, Monterey, CA 93943
Driving Directions | Campus Map

This is an official U.S. Navy Website |  Please read our Privacy Policy Notice  |  FOIA |  Section 508 |  No FEAR Act |  Whistleblower Protection |  Copyright and Accessibility |  Contact Webmaster

Export search results

The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

A logged-in user can export up to 15000 items. If you're not logged in, you can export no more than 500 items.

To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.