An analysis of cost overruns in the development of the Navy's A-12 Avenger aircraft [electronic resource]

Download
Author
McKsymick, Eric M.
McKsymick, Eric M.
Date
1995-12Advisor
Eaton, Donald R.
Metadata
Show full item recordAbstract
This thesis examines the termination of the Navy's A-12 Program. Specifically, the research sought to answer the question: Were the A-12 Program's cost overruns exceptional when compared to other major acquisitions. Prior research indicates that most major programs experience some degree of cost variance. To determine if the A-12's overruns were exceptional, the A-12 Program and 58 other contracts for developmental work are compared. The conclusion of the research is the A-12's overruns were exceptional. The cost overruns in the A-12 Program, at termination, exceeded 97 percent of other programs examined. To complete the Program may have cost between $9 and $11 billion. The required budget adjustment to complete the A-12 Program was greater than 91 percent of other programs. The research found no difference between cost variances of fixed-price contracts and cost-type contracts. The assertion that the use of a fixed-price contract contributed to the failure of the Program was not proven. There was also no statistical difference between the cost overruns of aircraft programs and other types of programs. The Government's decision to terminate the A-12 Program for cost overruns is justified, based on the sample of programs examined.
Rights
This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.Collections
Related items
Showing items related by title, author, creator and subject.
-
Cost and Time Overruns for Major Defense Acquisition Programs: An Annotated Brief
Berteau, David; Ben-Ari, Guy; Hofbauer, Joachim; Sanders, Gregory; Ellman, Jesse; Morrow, David (Monterey, California. Naval Postgraduate School, 2011-04-30); NPS-AM-11-C8P14R02-053Cost and time overruns in Major Defense Acquisition Programs (MDAPs) have become a high-profile problem attracting the interest of Congress, government, and watchdog groups. According to the GAO, the 98 MDAPs from FY2010 ... -
Business Models for Cost Sharing and Capability Sustainment
Pryce, Michael (2012-04-30); NPS-AM-12-C9P09R02-062Cost sharing in defense acquisition, with contractors sharing part of the burden of research, development, test, and evaluation (RDT&E) costs, has been suggested as a way of reducing the liability of governments to program ... -
DEFENSE ACQUISITION BEST PRACTICES: THE KNOWLEDGE-BASED APPROACH
Heard, Charles D. (Monterey, CA; Naval Postgraduate School, 2022-03);Over the last decade, several response plans and methods have been established to reduce schedule and budget overruns in the Department of Defense’s (DOD) procurement programs. The Government Accountability Office (GAO) ...