Theses and Dissertations
The Forward Observer Personal Computer Simulator (FOPCSim) 2
Cost benefit analysis of government furnished equipment versus contract furnished equipment for the procurement and integration of the MK-44 chain gun with the United States Marine Corps Expeditionary Fighting Vehicle
Outsourcing Options to Finance Navy Recapitalization
U.S. Marine Corps Equipment Readiness Information Tool: usage and decision-support for performance based logistics
Improving utility in the Marine Corps depot level maintenance program
Logistical impact study of photovoltaic power converter technology to the United States Army and the United States Marine Corps
Reducing the time and expenditure from prototype to production in information technology application development
Migrating from Win NT 4.0 to Win NT 5.0 in the Marine corps Enterprise Network (MCEN)
Analysis of the contingency contracting support plan within the joint planning process framework
Marine Corps contingency contracting MCI
Refine By:
Advisor
Author
Branch Of Service
-
Captain, United States Marine Corps (15)
-
Major, United States Marine Corps (15)
Date Issued
Degree
-
Masters (15)